Simulated workplaceCAQA GreenLoop Sustainability is a fictional business created by CAQA for training and assessment. It is not a real company and no person, client or record here is real.About this simulation
MSSCAQA GreenLoopSimulated workplace
Simulated workplace
Scenario · Environmental Monitoring and Field Services

Monitor boundary noise and buffer zone soil at Windsor

You are an environmental technician assigned to the Windsor consent review.

Intermediate4 to 5 hours7 tasks
Home/Scenarios/Monitor boundary noise and buffer zone soil at Windsor
The situation

What has happened

Council is reviewing the Windsor development consent and has requested boundary noise measurements during a normal windrow turning session and soil samples from the buffer zone downwind of the composting pads. The consent sets noise limits at three boundary points and the soil guideline values apply to the buffer zone. Bronwyn Tate has confirmed turning of windrows 26-090 and 26-091 on Thursday from 7:00 am. The sound level meter needs a calibration check with the acoustic calibrator before and after use. Ngaire Patterson wants a monitoring plan before the visit and a short report presenting the results against the limits, with a site map of the monitoring points.

Your brief. Prepare a monitoring plan, measure noise at the three boundary points during a normal turning session with correct meter calibration and weather records, collect soil samples in the buffer zone to the plan, process and present the data against the consent limits and guideline values and produce a short report with a site map.
Read the work request in your inbox
Tasks

Deliverables

  • Monitoring plan
  • Noise measurement records with calibration and weather
  • Chain of custody for soil samples
  • Register entries
  • Short report with site map
For trainers and assessors

Units of competency

Current on training.gov.au for the Sustainability as at 10 September 2026.

MSS025025Monitor and evaluate noise
MSS025035Perform sampling and testing of soils
MSS025032Report environmental data
MSS025024Produce site maps
MSS024028Process and present environmental data

Qualifications

MSS40222Certificate IV in Environmental Monitoring and Technology
MSS50222Diploma of Environmental Monitoring and Technology
Assessor notes

What to look for

Evidence guide

Look for a plan that reflects the consent conditions, meter calibration recorded before and after, background and weather recorded, measurement periods that match the work instruction, soil samples collected and documented correctly, and a report that compares results with the limits without overstating or understating them. The site map must be accurate enough for council to locate every point.

The student's evidence summary lists every record they created or changed in the systems named above, their notes and the tasks they ticked. Verify it against the deliverables and your own assessment tool.